so the two samurais made it to my yard and the fun has begun.
managed to get the inside stripped on the swb. lots of holes to fix. but the frame and supension seem solid.
For now, it is less work to get the SWB going for the season. Then I have all year to strip the LWB down and put a tubed cage/body on it. Get the second engine running and all. Then when winter hits, swap the drive train into the LWB.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.