Andrew and I have been working on stuff, pics are buried on the camera, but I will get them up eventually. Transmission has been mostly done for awhile, but we have been waiting on a part for about a week. It arrives tomorrow, so hopefully transmission / tc / doubler installed this weekend.
Exhaust is well under way, just needs final welding.
I changed my plans from George's np203/205 doubler (it would not work easily with my configuration / transmission) and called up North West Fab. They sent me off an un-anodized black box in very short order (great customer service). So doubler will be almost 5:1 now instead of 4:1. I will also get more options. 1:1, 2:1, 3:1, 5:1.
Seat bar changes are next on the hit list. There is some tweaking to accommodate the additional length for the doubler.
Drive shafts have been shortened / lengthened.
Shifter mounting is underway.
New tow rig acquired!